Greenfields Park (September 15, 2020)
Removed old park equipment and replaced with 2-5 year old play equipment and swings. Project also included removing and replacing play surface material, improving subsurface drainage system and added surrounding benches. In addition to replacing old equipment, a new 5-12 year old play system was added on the south side of the park with swings, benches and subsurface drainage system.
Stonebridge #2 Park (July 28, 2020)
Removed old park equipment and replaced with 2-5 year old play equipment, 5-12 year old play equipment, cruise line and swings. Project also included removing and replacing play surface material, improving subsurface drainage system and adding surrounding benches.
Fargo Cornerstone Bank Arena Disclaimer
LiveBarn streaming service is not controlled by Fargo Cornerstone Bank Arena. Should any issues or technical difficulties occur, the member needs to contact LiveBarn directly. Should any issues with log-ins, passwords, usernames, internet speeds or device compatibility arise, the member needs to contact LiveBarn directly.