Status: Current
Location: Riverwood Park
Expected Completion: Late August 2026
Project Overview: The Riverwood Park stormwater outlet repair project consists of excavating soil around the main existing drainpipe for the multipurpose field and installing fabric and riprap around the stormwater outlet to prevent further riverbank erosion.