Status: Current
Location: Milwaukee Trail
Estimated Completion: Fall 2025
Project Overview:
The Fargo Park District and the City of Fargo are removing deteriorated trail sidewalks and replacing with new concrete to restore safe and accessible pedestrian pathways.
The project includes:
- New 5-lane concrete roadway section to replace the existing roadway, which has reached the end of its useful lifespan and is becoming maintenance intensive
- Downsizing the existing grass and paved medians to help create additional boulevard space for sidewalks and trees
- Upsized storm sewer drainage system to help handle flooding concerns along the corridor
- Water main improvements
- Replacing or rehabilitating the sanitary sewer pipe to extend its usable lifespan
For more information on the project and trail impacts click HERE.